# Powering AI with Geothermal Energy
- URL: https://www.aixenergy.io/powering-ai-with-geothermal-energy/
- Published: 2026-11-16T13:00:00.000Z
- Updated: 2026-11-16T12:59:59.000Z
- Description: Google, Meta and Amazon have lined up just over a gigawatt of geothermal power for their data centers, more than a quarter of America’s geothermal fleet.
- Author: Morgan Bazilian
- Tags: Map Insights, Cognitive Grid

By Morgan Bazilian and Anna Littlefield

Article Summary

0:00

/39.105306

1×

On September 30, 2026, a 33-megawatt power block in Beaver County, Utah, began selling electricity. Fervo Energy says that makes Cape Station the first greenfield enhanced geothermal development in the world to reach commercial operation.[1](#note-1) Four weeks earlier Google agreed to buy 396 megawatts from capacity beyond the project’s first phase, with an option on roughly 600 more by June 2030\. The power is for a potential Utah data center whose plans, Fervo cautions, still depend on engineering feasibility, state and local approvals, and commercial conditions.[2](#note-2) AIxEnergy’s records place that data center at Google’s Eagle Mountain campus, south of Salt Lake City, though Fervo has not named the site.[3](#note-3) Google signed with a developer whose only previous commercial output was a Nevada pilot of a few megawatts.[4](#note-4)

U.S. geothermal plants produced about 16 billion kilowatt-hours in 2025, roughly 0.4 percent of utility-scale generation, more than nine-tenths of it in California and Nevada.[5](#note-5) That share has barely moved since 2001.[6](#note-6) Google’s Nevada supply pairs a 115-megawatt Fervo contract, approved by the Public Utilities Commission of Nevada in May 2025,[7](#note-7) with an Ormat Technologies contract for up to 150 megawatts, signed in February 2026, that the commission has yet to approve.[8](#note-8) Meta has signed separate agreements for up to 150 megawatts each with Sage Geosystems in Texas and XGS Energy in New Mexico,[9](#note-9) and the data center operator Switch has contracted about 13 megawatts from Ormat’s Salt Wells plant in Nevada for delivery from 2030.[10](#note-10) In May Amazon said it would back a 20-year contract under which Zanskar is to supply NV Energy with 100 megawatts from new Nevada plants by 2030, to serve Amazon’s data centers near Reno. That contract still needs the commission to approve the utility’s 2026 resource plan.[11](#note-11) With the Utah deal, geothermal supply contracted for U.S. data centers comes to about 1,149 megawatts, including two older Nevada deals and three military bases (see below), most of it due between 2027 and 2030\. That is more than a quarter of the roughly 4-gigawatt U.S. fleet.[12](#note-12) Google holds nearly three-fifths of the contracted total.

Table 1: Geothermal supply contracted for U.S. data centers

| Buyer                                          | Developer                                              | MW        | State      | Expected delivery                               | Regulatory status                                                                           |
| ---------------------------------------------- | ------------------------------------------------------ | --------- | ---------- | ----------------------------------------------- | ------------------------------------------------------------------------------------------- |
| Google                                         | Fervo Energy                                           | 396       | Utah       | First power mid-2028; full capacity by end-2028 | Not disclosed (15-year grid-connected PPA signed Sept. 2026)                                |
| Google (via NV Energy Clean Transition Tariff) | Fervo Energy                                           | 115       | Nevada     | Not disclosed                                   | Approved by Nevada PUC, May 2025                                                            |
| Google (via NV Energy Clean Transition Tariff) | Ormat Technologies                                     | Up to 150 | Nevada     | 2028–2030, as portfolio projects come online    | Pending Nevada PUC approval; ruling expected end-2026 or early 2027                         |
| Google                                         | Fervo Energy (Project Red)                             | 5         | Nevada     | Operating since Nov. 2023                       | Not disclosed (agreement signed 2021; 3.5 MW plant)                                         |
| Meta                                           | Sage Geosystems                                        | Up to 150 | Texas      | First phase targeted for 2027                   | Not disclosed                                                                               |
| Meta                                           | XGS Energy                                             | 150       | New Mexico | Fully operational by 2030 (two phases)          | Not disclosed                                                                               |
| Switch                                         | Ormat Technologies (Salt Wells plant)                  | About 13  | Nevada     | From Q1 2030, after plant upgrade               | Not disclosed (20-year PPA signed Jan. 2026)                                                |
| Switch                                         | Ormat Technologies (Don A. Campbell plants, Wild Rose) | About 32  | Nevada     | Supplying since 2019                            | Not disclosed                                                                               |
| Amazon (via NV Energy)                         | Zanskar                                                | 100       | Nevada     | By 2030, from a portfolio of new plants         | Pending Nevada PUC approval of NV Energy’s 2026 resource plan (20-year PPA signed May 2026) |
| U.S. Air Force (Joint Base San Antonio)        | Eavor Technologies, Sage Geosystems                    | 15        | Texas      | 2027–2028                                       | Behind the meter; permitted, drilling under way                                             |
| U.S. Army (Ellington Field, Houston)           | Sage Geosystems                                        | 3         | Texas      | 2027                                            | Behind the meter; under construction                                                        |
| U.S. Air Force (Mountain Home AFB)             | Zanskar, Eavor and Fervo                               | 20        | Idaho      | 2028                                            | Behind the meter; exploration drilling                                                      |

*Note: Total is up to about 1,149 MW, nearly three-fifths (666 MW) for Google. Not shown: Google’s option on about 600 MW more from Fervo in Utah (decision by June 2030). Counting deals outside the United States, AIxEnergy’s worldwide tally is about 1,479 MW.*

*Sources: Fervo, Ormat, Sage and Zanskar releases; Fervo and Ormat SEC filings; Google; Amazon; AIxEnergy; New Mexico governor’s office (all accessed Nov. 12, 2026).*

A 2025 Rhodium Group study estimated that if data centers keep clustering where they historically have, behind-the-meter enhanced geothermal could economically serve 55 to 64 percent of projected hyperscale demand growth by the early 2030s, or 15 to 17 gigawatts.[13](#note-13) Signed contracts amount to about 7 percent of the midpoint. The comparison is loose, because most of the contracts are grid-connected rather than behind the meter. The estimate assumed Inflation Reduction Act tax credits and a 20 percent “green” premium over regional retail power prices, and its authors said reaching it would require much faster permitting.

Figure 1 shows how closely the buyers have followed geothermal resource. The richest resource lies under the Great Basin of Nevada and western Utah. Around Reno the markers for Google, Amazon and Switch sit almost on top of one another, fed by plants scattered across the basin, and Google’s Eagle Mountain campus will draw on Cape Station, about 130 miles to the south. Meta has looked farther afield, to New Mexico and to the hot, pressurized sediments of south Texas. Basins farther east, such as Denver-Julesburg, hint at where enhanced techniques might reach next.

![](https://storage.ghost.io/c/e3/c9/e3c9e740-20f7-4e9c-9a31-131fc1166819/content/images/2026/11/AIxEnergy_DC_Linked_Geothermal_Map.png)

Fervo’s Project Red in Nevada, built under Google’s first geothermal agreement in 2021, has fed the grid that serves Google’s data centers there since 2023.[14](#note-14) Switch has drawn about 32 megawatts from Ormat’s Don A. Campbell plants at Wild Rose since 2019, by AIxEnergy’s count.[15](#note-15) The Pentagon’s Defense Innovation Unit has agreements with six developers, Fervo, Sage and Zanskar among them, to plan geothermal power at more than a dozen bases.[16](#note-16) Three of those bases, two in Texas and Mountain Home Air Force Base in Idaho, account for 38 megawatts of behind-the-meter supply for defense computing in AIxEnergy’s tally.[17](#note-17) Beyond the contracts lies a wider field. Ormat says more than 100 megawatts of its existing plants could be recontracted to data centers on the terms of its Switch deal.[18](#note-18) In Oregon, Mazama Energy is testing a 15-megawatt superhot-rock pilot at Newberry Volcano and aims for a 200-megawatt plant by 2030, power that could help run Central Oregon’s data centers. It puts the site’s potential above 5 gigawatts.[19](#note-19) Abroad, AIxEnergy counts another 330 megawatts of contracts, which lifts its worldwide tally to about 1,479.

Under Nevada’s Clean Transition Tariff, Google pays the difference between the geothermal price and the cheaper resource, usually solar or gas, that NV Energy would otherwise build under least-cost planning rules.[20](#note-20) The utility can then sign for first-of-a-kind capacity without passing the premium to customers. Ormat’s contract covers a portfolio, with a term that starts when the first plant enters service and runs 15 years past the last.[21](#note-21) Both Nevada structures shift the above-market cost of early projects, which least-cost planning would otherwise exclude, onto a large buyer. Utah may go further. The 396-megawatt contract is a conventional grid-connected, 15-year take-or-pay deal, but for the optional 600 megawatts Fervo and Google are pursuing direct, behind-the-meter supply to the data center under the state’s SB132, subject to regulatory approval.[22](#note-22)

Fervo raised about $2.2 billion in gross proceeds from its May IPO and closed $421.4 million of non-recourse debt for Cape Station’s first phase.[23](#note-23) In the first half of 2026 it booked $174,000 in revenue against a net loss of $87.7 million, and it expected $850 million to $900 million in capital spending in the second half, a range it cut in November to $700 million to $750 million, saying construction efficiencies had pushed some Phase II spending later.[24](#note-24) Its cost target for the 400-megawatt second phase is $5,500 per kilowatt, with a longer-term target of $3,000; it expects the first phase to come in at about $7,000.[25](#note-25) At $5,500, Phase II alone would cost about $2.2 billion, close to the IPO’s gross proceeds. Fervo says faster drilling underpins that target: in the second quarter one well reached a measured depth of nearly 19,500 feet in 21 days.[26](#note-26)

Energy Department research estimated the time from first exploration to first power at 8 to 10 years.[27](#note-27) Of the 61 projects in development in 2021, the National Laboratory of the Rockies (formerly the National Renewable Energy Laboratory) found in its 2025 market report that 29 had been discontinued and only 5 completed. Ormat accounted for 20 of the abandoned projects, 18 of them dropped at the earliest stage.[28](#note-28) In an October guest editorial in the *Journal of Petroleum Technology*, Marcus Oesterberg, chief operating officer of the developer Ignis Energy, argued that early exploration is venture risk, priced at required returns above 30 percent, and that cheaper capital (private equity, then infrastructure equity, then project debt) can follow only once a confirmation well has bounded the reservoir.[29](#note-29)

The 2025 budget reconciliation law, the One Big Beautiful Bill Act, curtailed wind and solar credits but kept geothermal eligible for the full credits on projects that begin construction through 2033.[30](#note-30) Projects starting construction from 2026 must show that at least 40 percent of their costs, rising to 60 percent by 2030, are not attributable to prohibited foreign entities.[31](#note-31) In September the Energy Department selected 21 projects for more than $99 million, noting that selection is not a commitment to fund.[32](#note-32)

About 65 percent of U.S. geothermal capacity sits on federal land, where the GAO found that acreage nominated for leasing rose from about 25,800 acres in 2020 to more than a million in 2025\. The Bureau of Land Management took an average of 455 days to bring a nomination to auction, and one Nevada office told the GAO it was 60 percent vacant, with only one of six geologist posts filled.[33](#note-33) In August a Utah sale drew $24.7 million in winning bids, including a bureau record of $1,207 per acre.[34](#note-34)

Fervo’s Nevada pilot, Project Red, reported losing about 30 percent of the water it injected underground. Kristie McLin, principal investigator at the Energy Department’s Utah FORGE research site next to Cape Station, has roughly estimated that supplying 2 gigawatts with enhanced geothermal could consume 42 million gallons of water a day.[35](#note-35) Fervo says Cape Station will lose far less, and that it draws on brackish groundwater rather than drinking water.[36](#note-36)

Closed-loop designs like XGS’s, which circulate fluid through sealed pipe, are built to avoid losses, but Stanford’s Roland Horne told *Grist* they generally yield less power per well and that their wells wear out sooner.[37](#note-37) Enhanced systems also carry the risk of induced seismicity, which operators will manage under mitigation protocols. Fervo says it has worked with the U.S. Geological Survey to verify its own.[38](#note-38)

Utility tariffs modeled on Nevada’s are the likeliest route to volume over the next five years, because they fund grid-connected plants without asking hyperscalers to move. Building campuses on the resource could go further. Rhodium estimated that siting data centers where geothermal is cheapest could meet all projected growth at costs 31 to 45 percent below the clustered case.[39](#note-39) Google’s 396 megawatts will reach Eagle Mountain over the grid, but its option on 600 more, which the partners hope to deliver behind the meter, could offer a first test of whether a hyperscaler will build at a remote Great Basin site with limited water and fiber. Remote sites carry a second risk, which Kenya has already met: a single campus can outgrow the grid around it. Microsoft and G42 planned a $1 billion geothermal-powered campus at Olkaria, and this spring President William Ruto suspended it, citing an eventual demand of about a gigawatt, a third of the country’s roughly 3 gigawatts of installed capacity.[40](#note-40) Because one buyer holds most of the contracted U.S. capacity, a change in Google’s plans would reshape the sector’s order book.

Fervo expects its remaining Phase I blocks to reach contractual commercial operation by January 1, 2027, and Phase II to follow in 2028.[41](#note-41) Nevada regulators still have to rule on the Ormat portfolio and on the resource plan that carries Zanskar’s contract, and Google has until June 2030 to decide on its option.[42](#note-42) If Fervo meets its dates at close to $5,500 per kilowatt, lenders will have a reference project for enhanced geothermal. At current build rates, geothermal would still supply a minority of AI load growth through the early 2030s, and its share after that turns mainly on whether costs reach Fervo’s $3,000-per-kilowatt target.

## Sign up for AIxEnergy Journal

The AIxEnergy Journal provides executive intelligence on AI infrastructure, data centers, electricity demand, electric grids, utilities, power markets, reliability, investment, and policy.

Subscribe 

Email sent! Check your inbox to complete your signup. 

No spam. Unsubscribe anytime.

## Notes

1. Fervo Energy, “Fervo Energy Declares Commercial Operation at Cape Station Ahead of Schedule, Leading the Race for Next Generation Geothermal Energy,” press release, October 1, 2026, exhibit 99.1 to Form 8-K, filed with the US Securities and Exchange Commission, accessed November 12, 2026, [https://www.sec.gov/Archives/edgar/data/1853868/000162828026064103/exhibit991pressrelease10126.htm](https://www.sec.gov/Archives/edgar/data/1853868/000162828026064103/exhibit991pressrelease10126.htm?ref=aixenergy.io). [↩](#ref-1)
2. Fervo Energy, “Fervo Energy and Google Sign 396 MW PPA,” press release, September 1, 2026, exhibit 99.1 to Form 8-K, filed with the US Securities and Exchange Commission, accessed November 12, 2026, [https://www.sec.gov/Archives/edgar/data/1853868/000162828026059707/exhibit991pressrelease9126.htm](https://www.sec.gov/Archives/edgar/data/1853868/000162828026059707/exhibit991pressrelease9126.htm?ref=aixenergy.io). [↩](#ref-2)
3. AIxEnergy, “Data Center-Related Geothermal Projects and Plants,” dataset (Excel workbook), November 13, 2026, entry GEO-DC-01\. [↩](#ref-3)
4. Fervo Energy, “Fervo Energy Reports Third Quarter 2026 Results,” earnings release, November 9, 2026, exhibit 99.1 to Form 8-K, filed with the US Securities and Exchange Commission, accessed November 12, 2026, [https://www.sec.gov/Archives/edgar/data/1853868/000162828026071911/exhibit991earningsrelease1.htm](https://www.sec.gov/Archives/edgar/data/1853868/000162828026071911/exhibit991earningsrelease1.htm?ref=aixenergy.io). Fervo reported 3 megawatts in operation at the end of June 2026, all of it at Project Red in Nevada. [↩](#ref-4)
5. US Energy Information Administration, “Use of Geothermal Energy,” Energy Explained, accessed November 12, 2026, [https://www.eia.gov/energyexplained/geothermal/use-of-geothermal-energy.php](https://www.eia.gov/energyexplained/geothermal/use-of-geothermal-energy.php?ref=aixenergy.io). [↩](#ref-5)
6. US Energy Information Administration, “Geothermal Resources Used to Produce Renewable Electricity in Western States,” Today in Energy, September 8, 2014, accessed November 12, 2026, [https://www.eia.gov/todayinenergy/detail.php?id=17871](https://www.eia.gov/todayinenergy/detail.php?id=17871&ref=aixenergy.io). [↩](#ref-6)
7. Briana Kobor, “Google’s New Model for Clean Energy Approved in Nevada,” *The Keyword* (blog), Google, May 13, 2025, accessed November 12, 2026, [https://blog.google/feed/nevada-clean-energy/](https://blog.google/feed/nevada-clean-energy/?ref=aixenergy.io). [↩](#ref-7)
8. Ormat Technologies, “Ormat Technologies Announces the Signing of Geothermal Portfolio PPA of Up to 150 MW to Support Google’s Data Center Operations Through NV Energy,” press release, February 17, 2026, accessed November 12, 2026, [https://investor.ormat.com/news-events/news/news-details/2026/Ormat-Technologies-Announces-the-Signing-of-Geothermal-Portfolio-PPA-of-Up-to-150-MW-to-Support-Googles-Data-Center-Operations-Through-NV-Energy/default.aspx](https://investor.ormat.com/news-events/news/news-details/2026/Ormat-Technologies-Announces-the-Signing-of-Geothermal-Portfolio-PPA-of-Up-to-150-MW-to-Support-Googles-Data-Center-Operations-Through-NV-Energy/default.aspx?ref=aixenergy.io); Ormat Technologies, *Form 10-Q: Quarterly Report for the Period Ended September 30, 2026* (filed with the US Securities and Exchange Commission, November 5, 2026), accessed November 12, 2026, [https://www.sec.gov/Archives/edgar/data/1296445/000129644526000017/ora-20260930.htm](https://www.sec.gov/Archives/edgar/data/1296445/000129644526000017/ora-20260930.htm?ref=aixenergy.io). Ormat’s latest filing says it expects the commission to rule at the end of 2026 or early in 2027\. [↩](#ref-8)
9. Sage Geosystems, “Sage Geosystems and Meta Announce Agreement for Next-Generation Geothermal Power Generation,” Business Wire, August 26, 2024, accessed November 12, 2026, [https://www.businesswire.com/news/home/20240826755596/en](https://www.businesswire.com/news/home/20240826755596/en?ref=aixenergy.io); Office of the Governor of New Mexico, “Governor Announces XGS Energy, Meta Geothermal Partnership: Nation-Leading 150 MW Geothermal Project on Its Way to New Mexico,” press release, June 12, 2025, accessed November 12, 2026, [https://governor.state.nm.us/newsroom/governor-announces-xgs-energy-meta-geothermal-partnership-nation-leadi-100004482](https://governor.state.nm.us/newsroom/governor-announces-xgs-energy-meta-geothermal-partnership-nation-leadi-100004482?ref=aixenergy.io); AIxEnergy, “Data Center-Related Geothermal Projects,” entry GEO-DC-15 (Texas location). [↩](#ref-9)
10. Ormat Technologies, *Form 10-Q, September 30, 2026*. [↩](#ref-10)
11. Zanskar, “Zanskar Inks 100 MW Power Purchase Agreement to Provide Carbon-Free, Firm Power to NV Energy,” press release, May 8, 2026, accessed November 12, 2026, <https://zanskargeothermal.substack.com/p/zanskar-inks-100-mw-power-purchase>; Amazon, “Amazon Invests in New Geothermal and Solar Projects to Power Future Nevada Data Centers,” About Amazon, May 8, 2026, accessed November 12, 2026, [https://www.aboutamazon.com/news/sustainability/amazon-renewable-energy-updates](https://www.aboutamazon.com/news/sustainability/amazon-renewable-energy-updates?ref=aixenergy.io). [↩](#ref-11)
12. US Government Accountability Office, *Geothermal Energy: Bureau of Land Management Should Improve Permitting Process as Development Demand Grows on Federal Lands*, GAO-26-108040 (Washington, DC: GAO, September 8, 2026), accessed November 12, 2026, [https://files.gao.gov/reports/GAO-26-108040/index.html](https://files.gao.gov/reports/GAO-26-108040/index.html?ref=aixenergy.io). [↩](#ref-12)
13. Ben King et al., “The Potential for Geothermal Energy to Meet Growing Data Center Electricity Demand,” Rhodium Group, March 11, 2025, accessed November 12, 2026, [https://rhg.com/research/geothermal-data-center-electricity-demand/](https://rhg.com/research/geothermal-data-center-electricity-demand/?ref=aixenergy.io). [↩](#ref-13)
14. Michael Terrell, “A First-of-Its-Kind Geothermal Project Is Now Operational,” *The Keyword* (blog), Google, November 28, 2023, accessed November 12, 2026, [https://blog.google/company-news/outreach-and-initiatives/sustainability/google-fervo-geothermal-energy-partnership/](https://blog.google/company-news/outreach-and-initiatives/sustainability/google-fervo-geothermal-energy-partnership/?ref=aixenergy.io); Fervo Energy, “Fervo Energy Announces Technology Breakthrough in Next-Generation Geothermal,” press release, July 18, 2023, accessed November 12, 2026, [https://fervoenergy.com/fervo-energy-announces-technology-breakthrough-in-next-generation-geothermal/](https://fervoenergy.com/fervo-energy-announces-technology-breakthrough-in-next-generation-geothermal/?ref=aixenergy.io). [↩](#ref-14)
15. AIxEnergy, “Data Center-Related Geothermal Projects,” entry GEO-DC-08, which cites Switch ESG reporting and Ormat Technologies’ Nevada supply filings, accessed November 13, 2026, [https://www.ormat.com/](https://www.ormat.com/?ref=aixenergy.io). [↩](#ref-15)
16. Defense Innovation Unit, “Department of Defense Expands Geothermal Initiative to Support Mission Assurance,” August 12, 2025, accessed November 12, 2026, [https://www.diu.mil/latest/department-of-defense-expands-geothermal-initiative-to-support-mission](https://www.diu.mil/latest/department-of-defense-expands-geothermal-initiative-to-support-mission?ref=aixenergy.io). [↩](#ref-16)
17. AIxEnergy, “Data Center-Related Geothermal Projects,” entries GEO-DC-18 to GEO-DC-20, which cite the Defense Innovation Unit, [https://www.diu.mil/](https://www.diu.mil/?ref=aixenergy.io), Sage Geosystems, [https://www.sagegeosystems.com/](https://www.sagegeosystems.com/?ref=aixenergy.io), and the US Air Force Civil Engineer Center, [https://www.afcec.af.mil/](https://www.afcec.af.mil/?ref=aixenergy.io) (all accessed November 13, 2026). [↩](#ref-17)
18. Ormat Technologies, “Ormat Technologies Signs 20-Year PPA with Switch for \~13MW of Carbon-Free Geothermal Capacity to Power Data Centers,” press release, January 12, 2026, accessed November 12, 2026, [https://investor.ormat.com/news-events/news/news-details/2026/Ormat-Technologies-Signs-20-Year-PPA-with-Switch-for-13MW-of-Carbon-Free-Geothermal-Capacity-to-Power-Data-Centers/default.aspx](https://investor.ormat.com/news-events/news/news-details/2026/Ormat-Technologies-Signs-20-Year-PPA-with-Switch-for-13MW-of-Carbon-Free-Geothermal-Capacity-to-Power-Data-Centers/default.aspx?ref=aixenergy.io). [↩](#ref-18)
19. Mazama Energy, “Mazama Superhot Rock EGS,” accessed November 12, 2026, [https://mazamaenergy.com/](https://mazamaenergy.com/?ref=aixenergy.io); Michael Kohn, “Mazama Energy Raises $135m for Newberry Geothermal Project,” *Bulletin* (Bend, OR), September 18, 2026, accessed November 12, 2026, [https://bendbulletin.com/2026/09/18/mazama-energy-raises-135m-for-newberry-geothermal-project/](https://bendbulletin.com/2026/09/18/mazama-energy-raises-135m-for-newberry-geothermal-project/?ref=aixenergy.io). [↩](#ref-19)
20. Emma Penrod, “NV Energy Seeks New Tariff to Supply Google with 24/7 Power from Fervo Geothermal Plant,” *Utility Dive*, June 21, 2024, accessed November 12, 2026, [https://www.utilitydive.com/news/google-fervo-nv-energy-nevada-puc-clean-energy-tariff/719472/](https://www.utilitydive.com/news/google-fervo-nv-energy-nevada-puc-clean-energy-tariff/719472/?ref=aixenergy.io). [↩](#ref-20)
21. Ormat Technologies, “Geothermal Portfolio PPA of Up to 150 MW.” [↩](#ref-21)
22. Fervo Energy, “Third Quarter 2026 Results.” [↩](#ref-22)
23. Fervo Energy, “Fervo Energy Reports First Quarter 2026 Results,” earnings release, June 22, 2026, exhibit 99.1 to Form 8-K, filed with the US Securities and Exchange Commission, accessed November 12, 2026, [https://www.sec.gov/Archives/edgar/data/1853868/000162828026044474/exhibit991-earningsrelease.htm](https://www.sec.gov/Archives/edgar/data/1853868/000162828026044474/exhibit991-earningsrelease.htm?ref=aixenergy.io). [↩](#ref-23)
24. Fervo Energy, “Fervo Energy Reports Second Quarter 2026 Results,” earnings release, August 12, 2026, exhibit 99.1 to Form 8-K, filed with the US Securities and Exchange Commission, accessed November 12, 2026, [https://www.sec.gov/Archives/edgar/data/1853868/000162828026055942/exhibit991earningsrelease8.htm](https://www.sec.gov/Archives/edgar/data/1853868/000162828026055942/exhibit991earningsrelease8.htm?ref=aixenergy.io); Fervo Energy, “Third Quarter 2026 Results.” [↩](#ref-24)
25. Fervo Energy, “Third Quarter 2026 Results.” [↩](#ref-25)
26. Fervo Energy, “Second Quarter 2026 Results.” [↩](#ref-26)
27. US Government Accountability Office, *Geothermal Energy*. [↩](#ref-27)
28. Dayo Akindipe et al., *2025 U.S. Geothermal Market Report*, NLR/TP-5700-91898 (Golden, CO: National Laboratory of the Rockies, June 2026), sec. 3.2.6, accessed November 12, 2026, [https://docs.nlr.gov/docs/fy26osti/91898.pdf](https://docs.nlr.gov/docs/fy26osti/91898.pdf?ref=aixenergy.io). [↩](#ref-28)
29. Marcus Oesterberg, “Guest Editorial: Geothermal Is a Risk-Sequencing Problem,” *Journal of Petroleum Technology*, October 1, 2026, accessed November 12, 2026, [https://jpt.spe.org/guest-editorial-geothermal-is-a-risk-sequencing-problem](https://jpt.spe.org/guest-editorial-geothermal-is-a-risk-sequencing-problem?ref=aixenergy.io). [↩](#ref-29)
30. Pierce Atwood LLP, “Congress Phases Out Energy Tax Credits,” client alert, July 7, 2025, accessed November 12, 2026, [https://www.pierceatwood.com/alerts/congress-phases-out-energy-tax-credits](https://www.pierceatwood.com/alerts/congress-phases-out-energy-tax-credits?ref=aixenergy.io). [↩](#ref-30)
31. Bracewell LLP, “FEOC Rules for Clean Energy Tax Credits,” January 16, 2026, accessed November 12, 2026, [https://www.bracewell.com/resources/feoc-material-assistance-rules-clean-energy-tax-credits/](https://www.bracewell.com/resources/feoc-material-assistance-rules-clean-energy-tax-credits/?ref=aixenergy.io). [↩](#ref-31)
32. US Department of Energy, “Energy Department Announces $99 Million for 21 Projects to Advance U.S. Geothermal Energy Development,” press release, September 21, 2026, accessed November 12, 2026, [https://www.energy.gov/articles/energy-department-announces-99-million-21-projects-advance-us-geothermal-energy](https://www.energy.gov/articles/energy-department-announces-99-million-21-projects-advance-us-geothermal-energy?ref=aixenergy.io). [↩](#ref-32)
33. US Government Accountability Office, *Geothermal Energy*. [↩](#ref-33)
34. US Department of the Interior, “Record $24M in Winning Bids for Utah Geothermal Leases,” press release, August 19, 2026, accessed November 12, 2026, [https://www.doi.gov/pressreleases/record-24m-winning-bids-utah-geothermal-leases](https://www.doi.gov/pressreleases/record-24m-winning-bids-utah-geothermal-leases?ref=aixenergy.io). [↩](#ref-34)
35. Austin Corona, “A Clean Energy Source Is Buried under the Desert, but It Takes Water to Use It,” *Grist*, September 22, 2026, accessed November 12, 2026, [https://grist.org/energy/geothermal-clean-energy-source-water-use/](https://grist.org/energy/geothermal-clean-energy-source-water-use/?ref=aixenergy.io). [↩](#ref-35)
36. Corona, “Clean Energy Source Is Buried under the Desert”; Cape Station, “Frequently Asked Questions,” accessed November 12, 2026, [https://capestation.com/frequently-asked-questions/](https://capestation.com/frequently-asked-questions/?ref=aixenergy.io). [↩](#ref-36)
37. Corona, “Clean Energy Source Is Buried under the Desert.” [↩](#ref-37)
38. Cape Station, “Frequently Asked Questions.” [↩](#ref-38)
39. King et al., “Potential for Geothermal Energy.” [↩](#ref-39)
40. Carlo Cariaga, “Kenya Suspends Plans for Microsoft’s Geothermal-Powered Data Centre,” ThinkGeoEnergy, May 8, 2026, accessed November 12, 2026, [https://www.thinkgeoenergy.com/kenya-suspends-plans-for-microsofts-geothermal-powered-data-centre/](https://www.thinkgeoenergy.com/kenya-suspends-plans-for-microsofts-geothermal-powered-data-centre/?ref=aixenergy.io). [↩](#ref-40)
41. Fervo Energy, “Commercial Operation at Cape Station.” [↩](#ref-41)
42. Ormat Technologies, *Form 10-Q, September 30, 2026*; Fervo Energy, “Fervo Energy and Google Sign 396 MW PPA.” [↩](#ref-42)

## Bibliography

- AIxEnergy. “Data Center-Related Geothermal Projects and Plants.” Excel dataset. November 13, 2026.
- Akindipe, Dayo, Faith Martinez Smith, Erik Witter, et al. *2025 U.S. Geothermal Market Report*. NLR/TP-5700-91898\. National Laboratory of the Rockies, June 2026\. [https://doi.org/10.2172/3014949](https://doi.org/10.2172/3014949?ref=aixenergy.io).
- Amazon. “Amazon Invests in New Geothermal and Solar Projects to Power Future Nevada Data Centers.” Entry in “How Amazon Is Preparing for the Energy Needs of the Future.” About Amazon, May 8, 2026\. Accessed November 13, 2026\. [https://www.aboutamazon.com/news/sustainability/amazon-renewable-energy-updates](https://www.aboutamazon.com/news/sustainability/amazon-renewable-energy-updates?ref=aixenergy.io).
- Bracewell LLP. “FEOC Rules for Clean Energy Tax Credits.” January 16, 2026\. [https://www.bracewell.com/resources/feoc-material-assistance-rules-clean-energy-tax-credits/](https://www.bracewell.com/resources/feoc-material-assistance-rules-clean-energy-tax-credits/?ref=aixenergy.io).
- Cape Station. “Frequently Asked Questions.” Accessed November 13, 2026\. [https://capestation.com/frequently-asked-questions/](https://capestation.com/frequently-asked-questions/?ref=aixenergy.io).
- Cariaga, Carlo. “Kenya Suspends Plans for Microsoft’s Geothermal-Powered Data Centre.” ThinkGeoEnergy, May 8, 2026\. [https://www.thinkgeoenergy.com/kenya-suspends-plans-for-microsofts-geothermal-powered-data-centre/](https://www.thinkgeoenergy.com/kenya-suspends-plans-for-microsofts-geothermal-powered-data-centre/?ref=aixenergy.io).
- Chang, Michelle, and I-Chun Hsiao. “Our First Geothermal Energy Deal in Asia.” *The Keyword* (blog), Google, April 15, 2025\. [https://blog.google/company-news/inside-google/around-the-globe/google-asia/geothermal-taiwan/](https://blog.google/company-news/inside-google/around-the-globe/google-asia/geothermal-taiwan/?ref=aixenergy.io).
- Constellation Energy. “The Geysers Geothermal Complex Completes 25-Megawatt Expansion Project, Strengthening California Grid Reliability.” Press release, June 8, 2026\. [https://www.constellationenergy.com/news/2026/06/the-geysers-geothermal-complex-completes-25-megawatt-expansion-project-strengthening-california-grid-reliability.html](https://www.constellationenergy.com/news/2026/06/the-geysers-geothermal-complex-completes-25-megawatt-expansion-project-strengthening-california-grid-reliability.html?ref=aixenergy.io).
- Contact Energy. “Contact Signs 10-Year Renewable Energy Agreement with Microsoft on New Geothermal Power Station at Te Huka.” News release, May 25, 2023\. [https://contact.co.nz/investor-centre/news/2023/contact-signs-ten-year-renewable-energy-agreement-with-microsoft](https://contact.co.nz/investor-centre/news/2023/contact-signs-ten-year-renewable-energy-agreement-with-microsoft?ref=aixenergy.io).
- Corona, Austin. “A Clean Energy Source Is Buried under the Desert, but It Takes Water to Use It.” *Grist*, September 22, 2026\. [https://grist.org/energy/geothermal-clean-energy-source-water-use/](https://grist.org/energy/geothermal-clean-energy-source-water-use/?ref=aixenergy.io).
- Defense Innovation Unit. “Department of Defense Expands Geothermal Initiative to Support Mission Assurance.” August 12, 2025\. [https://www.diu.mil/latest/department-of-defense-expands-geothermal-initiative-to-support-mission](https://www.diu.mil/latest/department-of-defense-expands-geothermal-initiative-to-support-mission?ref=aixenergy.io).
- Fervo Energy. “Fervo Energy and Google Sign 396 MW PPA.” Press release, September 1, 2026\. Exhibit 99.1, Form 8-K. US Securities and Exchange Commission. [https://www.sec.gov/Archives/edgar/data/1853868/000162828026059707/exhibit991pressrelease9126.htm](https://www.sec.gov/Archives/edgar/data/1853868/000162828026059707/exhibit991pressrelease9126.htm?ref=aixenergy.io).
- Fervo Energy. “Fervo Energy Announces Technology Breakthrough in Next-Generation Geothermal.” Press release, July 18, 2023\. [https://fervoenergy.com/fervo-energy-announces-technology-breakthrough-in-next-generation-geothermal/](https://fervoenergy.com/fervo-energy-announces-technology-breakthrough-in-next-generation-geothermal/?ref=aixenergy.io).
- Fervo Energy. “Fervo Energy Declares Commercial Operation at Cape Station Ahead of Schedule, Leading the Race for Next Generation Geothermal Energy.” Press release, October 1, 2026\. Exhibit 99.1, Form 8-K. US Securities and Exchange Commission. [https://www.sec.gov/Archives/edgar/data/1853868/000162828026064103/exhibit991pressrelease10126.htm](https://www.sec.gov/Archives/edgar/data/1853868/000162828026064103/exhibit991pressrelease10126.htm?ref=aixenergy.io).
- Fervo Energy. “Fervo Energy Reports First Quarter 2026 Results.” Earnings release, June 22, 2026\. Exhibit 99.1, Form 8-K. US Securities and Exchange Commission. [https://www.sec.gov/Archives/edgar/data/1853868/000162828026044474/exhibit991-earningsrelease.htm](https://www.sec.gov/Archives/edgar/data/1853868/000162828026044474/exhibit991-earningsrelease.htm?ref=aixenergy.io).
- Fervo Energy. “Fervo Energy Reports Second Quarter 2026 Results.” Earnings release, August 12, 2026\. Exhibit 99.1, Form 8-K. US Securities and Exchange Commission. [https://www.sec.gov/Archives/edgar/data/1853868/000162828026055942/exhibit991earningsrelease8.htm](https://www.sec.gov/Archives/edgar/data/1853868/000162828026055942/exhibit991earningsrelease8.htm?ref=aixenergy.io).
- Fervo Energy. “Fervo Energy Reports Third Quarter 2026 Results.” Earnings release, November 9, 2026\. Exhibit 99.1, Form 8-K. US Securities and Exchange Commission. [https://www.sec.gov/Archives/edgar/data/1853868/000162828026071911/exhibit991earningsrelease1.htm](https://www.sec.gov/Archives/edgar/data/1853868/000162828026071911/exhibit991earningsrelease1.htm?ref=aixenergy.io).
- HS Orka. “HS Orka og atNorth semja á ný um raforku” \[HS Orka and atNorth sign a new power agreement\]. September 12, 2024\. Accessed November 13, 2026\. [https://www.hsorka.is/um-okkur/frettir/almennar-frettir/hs-orka-og-atnorth-semja-a-ny-um-raforku/](https://www.hsorka.is/um-okkur/frettir/almennar-frettir/hs-orka-og-atnorth-semja-a-ny-um-raforku/?ref=aixenergy.io).
- King, Ben, Wilson Ricks, Nathan Pastorek, and John Larsen. “The Potential for Geothermal Energy to Meet Growing Data Center Electricity Demand.” Rhodium Group, March 11, 2025\. [https://rhg.com/research/geothermal-data-center-electricity-demand/](https://rhg.com/research/geothermal-data-center-electricity-demand/?ref=aixenergy.io).
- Kobor, Briana. “Our First-of-Its-Kind Partnership for Clean Energy Has Been Approved in Nevada.” *The Keyword* (blog), Google, May 13, 2025\. [https://blog.google/feed/nevada-clean-energy/](https://blog.google/feed/nevada-clean-energy/?ref=aixenergy.io).
- Kohn, Michael. “Mazama Energy Raises $135m for Newberry Geothermal Project.” *Bulletin* (Bend, OR), September 18, 2026\. [https://bendbulletin.com/2026/09/18/mazama-energy-raises-135m-for-newberry-geothermal-project/](https://bendbulletin.com/2026/09/18/mazama-energy-raises-135m-for-newberry-geothermal-project/?ref=aixenergy.io).
- Mazama Energy. “Mazama Superhot Rock EGS.” Accessed November 13, 2026\. [https://mazamaenergy.com/](https://mazamaenergy.com/?ref=aixenergy.io).
- Oesterberg, Marcus. “Guest Editorial: Geothermal Is a Risk-Sequencing Problem.” *Journal of Petroleum Technology*, October 1, 2026\. [https://jpt.spe.org/guest-editorial-geothermal-is-a-risk-sequencing-problem](https://jpt.spe.org/guest-editorial-geothermal-is-a-risk-sequencing-problem?ref=aixenergy.io).
- Office of the Governor of New Mexico. “Governor Announces XGS Energy, Meta Geothermal Partnership: Nation-Leading 150 MW Geothermal Project on Its Way to New Mexico.” Press release, June 12, 2025\. [https://governor.state.nm.us/newsroom/governor-announces-xgs-energy-meta-geothermal-partnership-nation-leadi-100004482](https://governor.state.nm.us/newsroom/governor-announces-xgs-energy-meta-geothermal-partnership-nation-leadi-100004482?ref=aixenergy.io).
- Ormat Technologies. *Form 10-Q: Quarterly Report for the Period Ended September 30, 2026*. Filed with the US Securities and Exchange Commission, November 5, 2026\. [https://www.sec.gov/Archives/edgar/data/1296445/000129644526000017/ora-20260930.htm](https://www.sec.gov/Archives/edgar/data/1296445/000129644526000017/ora-20260930.htm?ref=aixenergy.io).
- Ormat Technologies. “Ormat Technologies Announces the Signing of Geothermal Portfolio PPA of Up to 150 MW to Support Google’s Data Center Operations through NV Energy.” Press release, February 17, 2026\. [https://investor.ormat.com/news-events/news/news-details/2026/Ormat-Technologies-Announces-the-Signing-of-Geothermal-Portfolio-PPA-of-Up-to-150-MW-to-Support-Googles-Data-Center-Operations-Through-NV-Energy/default.aspx](https://investor.ormat.com/news-events/news/news-details/2026/Ormat-Technologies-Announces-the-Signing-of-Geothermal-Portfolio-PPA-of-Up-to-150-MW-to-Support-Googles-Data-Center-Operations-Through-NV-Energy/default.aspx?ref=aixenergy.io).
- Ormat Technologies. “Ormat Technologies Signs 20-Year PPA with Switch for \~13MW of Carbon-Free Geothermal Capacity to Power Data Centers.” Press release, January 12, 2026\. [https://investor.ormat.com/news-events/news/news-details/2026/Ormat-Technologies-Signs-20-Year-PPA-with-Switch-for-13MW-of-Carbon-Free-Geothermal-Capacity-to-Power-Data-Centers/default.aspx](https://investor.ormat.com/news-events/news/news-details/2026/Ormat-Technologies-Signs-20-Year-PPA-with-Switch-for-13MW-of-Carbon-Free-Geothermal-Capacity-to-Power-Data-Centers/default.aspx?ref=aixenergy.io).
- Penrod, Emma. “NV Energy Seeks New Tariff to Supply Google with 24/7 Power from Fervo Geothermal Plant.” *Utility Dive*, June 21, 2024\. [https://www.utilitydive.com/news/google-fervo-nv-energy-nevada-puc-clean-energy-tariff/719472/](https://www.utilitydive.com/news/google-fervo-nv-energy-nevada-puc-clean-energy-tariff/719472/?ref=aixenergy.io).
- Pierce Atwood LLP. “Congress Phases Out Energy Tax Credits.” Client alert, July 7, 2025\. [https://www.pierceatwood.com/alerts/congress-phases-out-energy-tax-credits](https://www.pierceatwood.com/alerts/congress-phases-out-energy-tax-credits?ref=aixenergy.io).
- Sage Geosystems. “Sage Geosystems and Meta Announce Agreement for Next-Generation Geothermal Power Generation.” Press release. Business Wire, August 26, 2024\. [https://www.businesswire.com/news/home/20240826755596/en](https://www.businesswire.com/news/home/20240826755596/en?ref=aixenergy.io).
- Sorenson, Vanessa. “New Zealand’s First Hyperscale Cloud Is Open for Business.” Microsoft New Zealand. December 12, 2024\. [https://news.microsoft.com/en-nz/2024/12/12/new-zealands-first-hyperscale-cloud-is-open-for-business/](https://news.microsoft.com/en-nz/2024/12/12/new-zealands-first-hyperscale-cloud-is-open-for-business/?ref=aixenergy.io).
- Terrell, Michael. “A First-of-Its-Kind Geothermal Project Is Now Operational.” *The Keyword* (blog), Google, November 28, 2023\. [https://blog.google/company-news/outreach-and-initiatives/sustainability/google-fervo-geothermal-energy-partnership/](https://blog.google/company-news/outreach-and-initiatives/sustainability/google-fervo-geothermal-energy-partnership/?ref=aixenergy.io).
- US Department of Energy. “Energy Department Announces $99 Million for 21 Projects to Advance U.S. Geothermal Energy Development.” Press release, September 21, 2026\. [https://www.energy.gov/articles/energy-department-announces-99-million-21-projects-advance-us-geothermal-energy](https://www.energy.gov/articles/energy-department-announces-99-million-21-projects-advance-us-geothermal-energy?ref=aixenergy.io).
- US Department of the Interior. “Record $24M in Winning Bids for Utah Geothermal Leases.” Press release, August 19, 2026\. [https://www.doi.gov/pressreleases/record-24m-winning-bids-utah-geothermal-leases](https://www.doi.gov/pressreleases/record-24m-winning-bids-utah-geothermal-leases?ref=aixenergy.io).
- US Energy Information Administration. “Geothermal Resources Used to Produce Renewable Electricity in Western States.” Today in Energy, September 8, 2014\. [https://www.eia.gov/todayinenergy/detail.php?id=17871](https://www.eia.gov/todayinenergy/detail.php?id=17871&ref=aixenergy.io).
- US Energy Information Administration. “Use of Geothermal Energy.” Energy Explained. Accessed November 13, 2026\. [https://www.eia.gov/energyexplained/geothermal/use-of-geothermal-energy.php](https://www.eia.gov/energyexplained/geothermal/use-of-geothermal-energy.php?ref=aixenergy.io).
- US Government Accountability Office. *Geothermal Energy: Bureau of Land Management Should Improve Permitting Process as Development Demand Grows on Federal Lands*. GAO-26-108040\. US Government Accountability Office, September 8, 2026\. [https://files.gao.gov/reports/GAO-26-108040/index.html](https://files.gao.gov/reports/GAO-26-108040/index.html?ref=aixenergy.io).
- Zanskar. “Zanskar Inks 100 MW Power Purchase Agreement to Provide Carbon-Free, Firm Power to NV Energy.” Press release, May 8, 2026\. <https://zanskargeothermal.substack.com/p/zanskar-inks-100-mw-power-purchase>.